Estrella del Mar Condos - Phase II
Keeping you updated on the construction

 

February 29, 2008


BUILDING 3 / CONNECTING BUILDINGS FINISH OUT (BETWEEN 3 AND 4)


BUILDING 4 EAST ELEVATION / BUILDING 4 OUTSIDE FINISH OUT


LANDSCAPING AND HATCH OVER HOT TUB EQUIPMENT / HANDRAIL IN HOT TUB


LANDSCAPING BETWEEN BUILDINGS 3 AND 4 / LANDSCAPING BETWEEN BUILDINGS 4 AND 5


MAIN STAIRWAY FINISH OUT / LANDSCAPING IN EDGES OF TERRACES, BUILDINGS 3 AND 2


APOXY COAT ON CLAY TILE RAILING


SAFETY CRATE FLOORS IN MEP SHAFTS


WIRE CONNECTING CAPS ON A/C UNITS / LOCKS IN DOORS OF MEP SHAFTS

December 26, 2007

August 20, 2007

July 10, 2007

June 5, 2007

April 22, 2007

March 7, 2007

January 25, 2007

December 4, 2006

October 29, 2006

September 18, 2006

August 22, 2006

July 22, 2006

July 5, 2006

June 15 , 2006

March 31,2006

March 20 - 22, 2006